Extraction · Heat recovery · EPB reports

Fresh indoor air for lasting comfort.

Controlled ventilation is essential in every modern build or renovation. From wet-room extraction to balanced heat-recovery systems, we deliver fresh filtered air, remove humidity and odours, cut heat loss and provide the required EPB compliance reports.

Air systems

Healthy air, energy savings and EPB compliance.

Quiet, balanced duct networks designed to protect both occupant wellbeing and building fabric.

Wet-room extraction (System C)

Controlled extraction for kitchens, bathrooms, utility rooms and toilets—ideal for tight renovation constraints.

Heat-recovery ventilation (System D)

Continuous filtered fresh air pre-warmed via a high-efficiency heat exchanger to minimise thermal losses.

Official EPB reports

Installations built to Walloon regulatory standards with complete commissioning measurements for EPB filing.

Acoustic & airflow balancing

Low-pressure-drop duct runs, acoustic attenuators and calibrated room-by-room valve balancing.

Ductwork engineering

Coordinated networks for homes and commercial sites.

Our expertise in ceiling and basement service runs guarantees clean routing and verified airflows matching technical drawings.

  • Room-by-room statutory airflow calculation ahead of site work
  • Durable rigid and semi-rigid ductwork designed for easy cleaning
  • Final anemometer balancing for mandatory EPB certification
Overhead technical pipes and cable trays installed in an underground garage
Real project · Services

Coordinated overhead service routing

Clean pipe and technical duct runs mounted in an underground service bay.

EPB workflow

From airflow design to final EPB report.

01

Airflow calculation

Review of architectural plans and wet/dry room areas against Belgian standards.

02

Duct schematic

Optimal placement of the ventilation unit, manifolds and discreet ceiling valves.

03

Airtight installation

Insulated ducting, manifold boxes and exterior intake/exhaust terminals.

04

Balancing & EPB report

Airflow testing at every terminal and issue of the full EPB compliance report.

Frequently asked questions

Ventilation & EPB questions

Do you supply the airflow report needed for EPB filing?

Yes. We install to Walloon regulatory standards and provide the measured commissioning reports required by your EPB assessor.

System C extraction or System D heat recovery?

System C extracts stale humid air and works well in constrained retrofits; System D recovers heat from exhaust air to minimise winter heat loss.

Are balanced heat-recovery systems noisy?

No. Proper duct sizing, acoustic silencers and calibrated airflow rates keep operation whisper quiet.

Do you also ventilate offices and commercial spaces?

Yes, we install residential and commercial ventilation systems across Wallonia.

Advice & quote

Planning a heating, plumbing or HVAC project in Wallonia?

Contact our engineering office in Manage to schedule a technical site visit or discuss your installation.